Unidirectional Hangar Door
Design & Fabrication, Unloading, Door Installation, Electrical Installation, Owner Training
Design & Fabrication, Unloading, Door Installation, Electrical Installation, Owner Training
Contracted to design, manufacture and install this unidirectional bottom rolling hangar door system at Tampa International for a new $33 million building.