All Moving Bottom Rolling Door – Embraer Aviation

//All Moving Bottom Rolling Door – Embraer Aviation
All Moving Bottom Rolling Door – Embraer Aviation 2016-06-08T17:15:31+00:00

Project Description

All Moving Bottom Rolling Door – Embraer Aviation

Hangar Door Configuration:  6-Leaf, All Moving Door
Opening Dimensions:  2 Doors 163′ x 28′

$76 million expansion project at Embraer’s facility at Melbourne International Airport in Florida. Project Summit, will be completed in four phases. The project will add additions to the assembly facility, a paint building and a two-bay delivery hangar.

Key Points:

  • Northern Stack
  • Design Wind Load 170MPH
  • Insulated Interior & Exterior Panels
  • 6 x In frame AeroGlide Motor Operators
  • Safety Limit Switch System
  • Safety Edges
  • Telescoping Hardware & Floating Weather Seal
  • Track Cleaners
  • Full weather stripping with 2-ply cloth inserted neoprene between leafs and at the bottom and top of each door panel, providing a full perimeter weather seal.